Production Flight Case

Production Case - 4 Drawer and Keyboard Shelf

Production Case - 4 Drawer and Keyboard Shelf

£806.00 £671.67
SKU
NSP PRD-4
Order in the next for UK delivery on Thursday 28th of November 2019
This 4 drawer production case is an ideal workstation for any lighting engineer. Comes with 4 x drawers and a pull out shelf for keyboard and mouse.

The Ultimate Production Case

Made in Britain

This 4 drawer touring production case is an ideal workstation for a variety of professionals within the AV industry, Motorsport Industry & Live Sound to name a few. This production case comes complete with 4 storage drawers - ideal for tools and other small equipment - as well as a pull-out shelf for your keyboard and mouse.

Custom options are available upon requests such as company branding and coloured finishes.

View Cooperate Video
Production Flight Case
Production Flight Case

Production Flight Case

Case Specifications (WxDxH mm)

External Dimensions: 800 x 600 x 900 inc wheels.

Internal Drawer 1: 765 x 475 x 240

Internal Drawer 2: 350 x 475 x 135

Internal Drawer 3: 350 x 475 x 135

Internal Drawer 4: 765 x 475 x 80

Superior Features

Production Flight Case

We have designed this case to be the best value on the market, heavy duty latches for longer life and stronger hold, heavy duty 30mm aluminium edging makes the construction ultra strong, UK rubber castors with a high load rating and 4 storage drawers.

  • 9mm Birch Plywood
  • Black Phenolic Finish
  • Heavy Duty Hardware
  • Front Removable Lid
  • Recessed Flip Handles
  • 4 x Heavy Duty Castors
  • Lifetime Guarantee
  • Rear Inlet for Power
  • Pull out Keyboard Shelf

Delivery Information



UK Deliveries

For UK Deliveries, we use DPD for most items. If the product is a "bulky" item, we'll dispatch on a pallet network


European Deliveries

For European deliveries, please allow a further 2-5 days on top of the stated lead times


USA / Canada

For USA and Canada, we ship using Fedex, please allow a further 2-3 days on top of the stated lead times